Don't sacrifice your hardware for cheap hosting rates.
HashrateUp gives independent buyers direct access to enterprise-level facilities usually reserved for bulk orders. Cheap hosting looks great on paper, until poor cooling, frequent downtime, and slow repair paths destroy your margins.
Hydro units are serious capital assets. HashrateUp takes a long-term view: slightly higher operational quality can mean better uptime, longer machine life, and fewer reasons to switch hosts.
Protect your hardware first, then secure your yield for the long haul.
Sustainable production beats fragile upside.
Secure space in top-tier facilities without needing institutional order sizes.
Mining returns are built on operational reliability: power, cooling, uptime, and communication.
The cheapest kWh is rarely the best kWh. Minimizing downtime and repair delays protects your total yield far better than chasing headline prices.
Hydro cooling can reduce heat and mechanical wear for steadier BTC production.
High-level deal terms.
Billed directly from physical container meters.
Power billing is anchored to dedicated physical meters on each container, then allocated clearly for shared container deployments.









| Model | Hashrate | Efficiency | Power draw | Machine price | Price to mine 1 BTC |
|---|---|---|---|---|---|
| Antminer S21e XP Hydro | 430 TH/s | 13.0 J/TH | 5.59 kW | $3,925 | $99,739 |
| Antminer S21e Hydro | 288 TH/s | 17.0 J/TH | 4.90 kW | $1,320 | $112,858 |
| Antminer S21e Hydro | 310 TH/s | 17.0 J/TH | 5.27 kW | $1,490 | $113,175 |
| Antminer S21e Hydro | 332 TH/s | 17.0 J/TH | 5.64 kW | $1,630 | $113,228 |
| Antminer S21+ Hydro | 338 TH/s | 15.0 J/TH | 5.07 kW | $2,400 | $106,953 |
| Antminer S21+ Hydro | 358 TH/s | 15.0 J/TH | 5.37 kW | $2,575 | $107,024 |
| Antminer S21+ Hydro | 395 TH/s | 15.0 J/TH | 5.92 kW | $2,525 | $104,825 |
| Antminer S21 Hydro | 319 TH/s | 16.0 J/TH | 5.10 kW | $2,275 | $112,982 |
| Antminer S21 XP+ Hydro | 480 TH/s | 12.0 J/TH | 5.76 kW | $9,125 | $117,874 |
| Antminer S23 XP Hydro | 600 TH/s | 8.9 J/TH | 5.34 kW | $16,275 | $119,367 |
| Antminer S23 Hydro | 563 TH/s | 9.5 J/TH | 5.35 kW | $12,675 | $111,673 |
Cost assumptions: Mid BTC hashprice · 98% expected uptime · $0.069/kWh · 0% pool fee · four-year horizon. Cost per BTC includes the machine, $380 setup and shipping, and hosting. Figures are indicative and before taxes, repairs, customs, financing costs, and site-specific variance.
Choose a machine and your future Bitcoin price assumption. The calculator compares what you pay to mine BTC with what you believe that BTC will be worth.
Inputs
Edit hashprice and calculation assumptions
Mid is the default. Presets are BTC/PH/s/day averages over periods starting September 2026 and include the 2028 halving.
Optional 100% first-year equipment deduction scenario. Pre-tax mining costs and BTC production stay unchanged.
Assumes eligible property acquired and placed in service after January 19, 2025, and sufficient tax capacity for the portion you mark usable. Texas hosting alone does not establish eligibility. State conformity, income taxes on mining, operating-expense deductions, loss limitations and resale/recapture taxes are not calculated. Confirm your assumptions with your tax adviser. Before you model it, read my guide to bonus depreciation for Bitcoin miners, including when a hosted machine counts as placed in service. IRS depreciation guidance.
Mine versus buy over time
Illustrative path using your selected assumptionsYour pre-tax mine vs buy numbers
$0 total mining cost. BTC mined = PH/s x average BTC hashprice x days x uptime x (1 - pool fee). Fleet totals scale with machine count. All-in cost includes hardware, $380 setup and shipping per machine, and hosting at $0.069/kWh.
Depreciation benefit estimate
| Deployment year | Equipment deduction | Tax benefit used | Cumulative cost after benefit |
|---|
Year 1 represents the placed-in-service tax year. The eligible basis is deducted once in Year 1, even if the benefit is used later. Savings are shown at year-end, not as a discount on the purchase invoice. This annual illustration does not calculate exact filing/refund dates or the time value of money. Ordinary depreciation, which may provide deductions without bonus depreciation, is not modeled: this is not the incremental saving versus a standard depreciation schedule. The machine can keep operating after its tax basis is written off.
Assumptions
- Bitcoin price. Your selected price is used to value every Bitcoin mined. On the chart, Bitcoin moves in a straight line from today’s live price to your selected price. This is an illustration, not a price forecast.
- Bitcoin production. BTC mined is calculated from the machine’s hashrate, average BTC hashprice, selected period, uptime and pool fee.
- BTC hashprice. Mid is the default. You can choose Bear, Mid or Bull, then adjust the average yourself. These are BTC-denominated production assumptions, not the USD hashprice shown in the site header.
- Halving. The preset averages include lower BTC production after the expected April 2028 block subsidy halving. The chart marks the halving date for context.
- Costs. Total mining cost includes all selected machines, $380 setup and shipping per machine, plus hosting at $0.069/kWh while the machine is online. It excludes taxes, customs, repairs, financing and other site-specific costs. No resale value is credited.
- What you save. This is what the mined Bitcoin would be worth at your selected price, less the total cost to mine it. Put another way, it compares mining with buying the same amount of Bitcoin at that price.
- Illustrative only. Mining output and costs can change with network conditions, transaction fees, downtime and operating performance. This calculator is not financial advice.
Hydro hosting, explained.
Hydro hosting questions answered.
What is this hydro hosting opportunity?
It provides private miners and institutional investors access to US-based hydro mining infrastructure, combined with selected hydro hardware. HashrateUp coordinates hardware procurement, contracting, site onboarding, and ongoing operational deployment.
Who is the contracting counterparty?
You contract directly with HashrateUp. HashrateUp manages the client agreement and coordinates execution with the facility operator.
What services are included in the hosting agreement?
The fee covers facility rack space, high-density hydro cooling infrastructure, power delivery, network redundancy, physical security, daily site monitoring, basic maintenance, and local technical support.
What is the power rate?
Hosting is billed at a fixed, all-in rate of $0.069/kWh.
How long is the hosting contract?
The standard initial contract term is 24 months, with renewal options detailed in the service agreement.
What racking fees apply?
Racking fees are $40 per unit upon initial installation and $40 per unit upon decommissioning and removal.
Is an upfront deposit required?
Yes. One month prepayment and one month deposit are required before hardware energization. Final credit mechanics and deposit applications are governed by the signed agreement.
How is monthly power consumption billed?
Each container has a dedicated physical power meter measuring actual kWh. In the current shared-container setup, the container meter reading is allocated proportionally based on each client's machine count and rated power draw, then billed at the fixed $0.069/kWh rate.
What happens if a hosting invoice is not paid on time?
Non-payment follows a written escalation process. Invoices are issued at month-end and are payable on the first business day of the following month. If payment is missed, reminders and a formal disconnection notice are issued before machines are powered down. Reconnection only begins after all outstanding amounts and applicable reconnection fees are settled, subject to available capacity.
What uptime parameters apply to the facility?
Expected uptime is 98%. The contractually guaranteed minimum is 94%, evaluated on a rolling 12-month basis following the initial 12 months of deployment.
What happens if facility uptime falls below the target?
Specific SLA credits and operational remedies are defined directly in your final service agreement.
Is there downtime compensation?
Yes. The hosting structure includes a downtime compensation mechanism, with the exact credit or remedy governed by the signed service agreement. Ordinary operational downtime is treated differently from force majeure or supply-side events, and ERCOT summer 4CP periods may have separate treatment. After the normal commissioning period, operations are expected to be materially more stable, with compensation only relevant if measured uptime falls below the agreed threshold.
Who retains title to the mining hardware?
You maintain full title and ownership of all purchased hardware throughout the hosting term.
How is hardware insurance managed?
Facility insurance coverage parameters and client hardware options are explicitly detailed in the final contract. Clients should assume physical loss, theft, or external damage requires separate coverage unless specified.
How are hardware repairs and routine maintenance handled?
Site staff handle standard maintenance, including resets, connection monitoring, basic diagnostic checks, and filter or fluid line inspections. Component-level repairs or board replacements require your written authorization and are billed for parts and specialized labour.
Can I use an outside repair technician?
Yes. Third-party maintenance or off-site repair logistics can be arranged in coordination with site management to ensure security and operational safety.
Are custom firmware modifications allowed?
Firmware alterations that impact cooling requirements, thermal output, power draw, or electrical stability must be reviewed and approved by site operations before deployment.
Can machines be underclocked to lower power draw?
No. Underclocking hardware to lower consumption below contract baseline levels is not permitted under current site operational rules.
Is hardware overclocking supported?
Overclocking requests are evaluated individually based on local climate conditions, electrical limits, and coolant capacity at the time of request.
What options exist for early contract termination?
Early exit terms, notice periods, fees, and deposit settlements are set forth in the signed service order.
How are potential deployment delays handled?
The agreement includes protective remedies if capacity delivery or energization extends beyond the contracted installation window.
Does the client receive power grid curtailment or demand response revenue?
No. Load-balancing program revenues and grid curtailment incentives are retained by the site operator and are not applied against the client power rate.
Are contract terms and facility details confidential?
Yes. Pricing schedules, exact facility locations, service orders, and technical specs are strictly confidential and require mutual written consent for public disclosure.
What investor or miner profile is the best fit for this offering?
This program is designed for clients seeking long-term production through high-scale hydro infrastructure, spanning individual one-unit allocations up to multi-megawatt institutional deployments. It is built for buyers who value operational stability and operator track record over chasing speculative low-tier power rates.
Which hydro hardware models are available through this program?
Allocations focus on modern Bitmain Antminer hydro series units, such as S21 and S23 hydro models. Hardware pricing is confirmed directly before invoice generation.
Are financial returns or payback schedules guaranteed?
No. Mining returns depend on network difficulty adjustments, hashprice shifts, Bitcoin market price, facility uptime, repair costs, pool fees, local taxes, shipping, and financing structure. Projections are illustrative models, not financial guarantees.
This page is a public summary, not a signed hosting agreement or investment recommendation. Final commercial terms, uptime remedies, reporting rights, insurance, liability, hardware availability, and site allocation details are confirmed in writing before funds move.
Want the hydro allocation view?
Send machine count, preferred model, and whether you already own the miners or need hardware sourced.
Request allocation